Send Message
products

1200W Railway Station Toroidal Power Transformer 160VAC To 40VAC/30A

Basic Information
Place of Origin: CHINA
Brand Name: WINLEY
Certification: ISO,CE
Model Number: 1200W
Minimum Order Quantity: 50units
Price: $20-$600
Packaging Details: Pallet
Delivery Time: 10-15days
Payment Terms: T/T
Supply Ability: 10000units/month
Detail Information
Usage: Railway Station Primary Voltage: 160V
Secondary Voltage: 40VAC Dielectric Strength: 4KV/5mA
Material: UL Approved Materials Output Current: 30A
Frequency: 50Hz Or 60Hz Core Material: Crgo Silicon Steel
High Light:

Railway Station toroidal power transformer

,

Railway Station Tansformer 160VAC To 40VAC

,

1200W toroidal power transformer


Product Description

1200W Railway Station Toroidal Tansformer 160VAC To 40VAC/30A
 
 

Features

 
1). Vacumn epoxy encapsulated
2). Small dimension
3). Wide application
4). Lead type output
5). Voltage: Can be customized

 

 

Specifications

ItemDescription
Capacity1200VA
Frequency50/60Hz
Max. Temperature60℃
Temperature rise<60℃
Insulation classB/F
Voltage ratio160VAC-40VAC
Winding materialCopper
Insulation ResistancePRI.-SEC.: 500V DC 100 MΩ/Primary to Secondary 500VDC 100MΩ Min.
Short-Circuit of winding turnPRI. Iput: 440V AC 150HZ/ Primary and Secondary Not break down)
Hi-Pot TestPRI.-SEC.: 4.2KV/5mA/2S / Primary and Secondary Not break down )
Mounting metal plateProvided
Rubber gasketProvided
StandardsVDE0550/IEC204-1/IEC61558/EC439
Warranty24monthes

 

 

VA Calculation

 

1. Read the transformer’s secondary winding rating (printed or tagged on the transformer case). This should give a rating such as 5V, 500mA.

Multiply the voltage times the current to receive the VA.

Example: 5V times 500mA (or 0.5A) equals 2.5VA

2.Convert the secondary winding VA value to the primary winding VA rating as the equation VA (Primary) equals VA (Secondary) or VA (p)=VA(s)

For example of a 2.5VA secondary, if the primary voltage is 120V the current will be A (p) = VA(s) / V(p). Giving A(p) = 2.5 / 120 = 0.020833(roughly 21mA).

This is the calculation for a single input winding/single output winding transformer.

3. Add the separate VA ratings for a transformer with multiple secondary windings.

For secondary winding 1 = 5VA at 500mA

Secondary winding 2 = 24V at 100mA

Total Secondary VA = ( 5 X 0.5 ) + ( 24 X 0.1 ) = 4.9VA

Primary VA will still equal the total secondary VA.

 

1200W Railway Station Toroidal Power Transformer 160VAC To 40VAC/30A 0

1200W Railway Station Toroidal Power Transformer 160VAC To 40VAC/30A 1

 

FAQ

 

1. Q: Can I have a sample order?

A: Yes, we welcome sample order to test and check quality.

2. Q: What is the lead time?

A: Sample time 3-7 days, we usually ship by DHL, UPS, FedEx,etc. Mass production time 7-25 days.

3. Q: How long is the warranty?

A: 24 monthes from B/L. If there are any accessory problems,just provide the photos of damaged accessory,then we will provide free service. According to the number of products,we will provide easily damaged accessories for free. we also can provide technical support if you need.

4. Q: Is OEM/ODM available?

A: Yes,it is! We are manufacturer with our own R&D team, we can customize products according to customer's drawing or requirements.

Customized services:

a. Customized color and special function.

b. Customized box.

c. Print customer's logo(MOQ:≥10pcs).

d. Your other ideas about product, we can help you design and put them into production. The above customized services must be confirmed before production.

5. Q: How to control the products quality?

A: Our company owns the core technology ,all kinds of products hold CE certificate. We have professional engineers. Workers are strictly required to make products according to the drawings. Each process has technical instructors.The QC supervisors will regularly inspect the production. We will do products performance tests during production, and comprehensive quality tests when the products is completed.

Contact Details
Steven

Phone Number : 86-18650108051

WhatsApp : +8618650108051