Cases
6500kVA Cast Resin Transformers for an Australian Wind Farm Project in 30 Days
Project Snapshot Winley Electric successfully delivered three repeat order batches of 6500kVA cast resin dry-type transformers for a major wind farm project in Western Australia. Specially engineered for renewable energy applications, these high-capacity units were designed to step up output voltage ...
2026-08-27
12 Outdoor Cast-Resin Transformers for a U.S. Manufacturing Park
1. Project Overview Winley Electric manufactured and delivered 12 three-phase cast-resin dry-type transformers for outdoor power distribution at a U.S. manufacturing park. The order comprised four capacity ratings integrated into a single 12.47 kV to 480Y/277 V distribution network under a tight 45...
2026-08-20
Two Custom 34 MVA Substation Transformers Ready for North America Project in 84 Days
Project Background & Customer Requirements At a large industrial facility in North America, the 11 kV substation powers critical continuous process loads, including high-power motors, pumps, and ventilation systems. To isolate the incoming supply and guarantee uninterrupted plant operations, the ...
2026-08-04
Custom 8MVA Transformer Connects Solar PV and BESS Systems to a 34.5kV Grid
Project Background Utility-scale solar PV and battery energy storage projects commonly use transformers to connect low-voltage inverter or power conversion system blocks to a medium-voltage collector network. NREL has documented utility-scale PV plants where individual 4MVA inverters operate at 480V ...
2026-07-14
31 Three-Phase Pad-Mounted Transformers Delivered for a North American Distribution Project
Winley Electric delivered 31 three-phase pad-mounted transformers for a North American distribution project, covering 2550 kVA and 3750 kVA ratings across 12.87 kV and 34.5 kV primary voltage requirements. With 31 units covering three specifications, the project required Winley to manage engineering ...
2026-06-30
40 MVA Substation Transformer Project | 2 Units Manufactured & Tested for USA Within 12 Weeks
40 MVA Substation Transformer Project | 2 Units Manufactured & Tested for USA Within 12 Weeks Overview Across North America, aging grid infrastructure, surging municipal power demand, renewable energy interconnection and regional load expansion have created severe supply shortages for large-capacity ...
2026-04-21