500kVA Three-Phase Oil-Immersed Step-Up Substation Transformer 415V to 1kV
| Brand Name: | WINLEY |
| Model Number: | S-500/1/0.415 |
| MOQ: | 1unit |
| Price: | $5000-$150000 |
| Packaging Details: | Plywood case |
| Payment Terms: | T/T |
500kVA Three-Phase Oil-Immersed Step-Up Substation Transformer 415V to 1kV
The Winley S-500/1/0.415 is a 500kVA three-phase oil-immersed substation transformer built to AS 60076. Designed for 50Hz systems, it steps up standard 415V supply to a 1000V output, powering 1kV mining equipment and long-distance industrial site feeders.
- 415V to 1000V Step-Up Conversion: Boosts standard 415V three-phase power directly to 1kV to support 1kV machinery and minimize voltage drop over extended cable runs.
- AS 60076 Compliance & Routine Testing: Manufactured and factory-tested to Australian Standard AS 60076 (including 45kV/28kV BIL impulse ratings and 12-hour tank pressure leak tests) for direct deployment in Australian and Commonwealth industrial grids.
- Heavy-Duty Skid Base & Oil Containment: Supplied with a 3000mm × 1800mm Q235 structural steel skid base featuring 16mm lifting lugs and four 1-inch drain valves for stable site placement and leak containment.
Factory inspection photos, nameplate details, and structural views of the Winley S-500/1/0.415 500kVA AS60076 oil-immersed substation transformer with its integrated oil containment bund.
![]()
![]()
| Specification | Data | Specification | Data |
|---|---|---|---|
| Transformer Type | Three-Phase Step-Up Substation Transformer | Model | S-500/1/0.415 |
| Rated Capacity | 500kVA | Frequency | 50Hz |
| Secondary Voltage | 415V | Primary Voltage | 1000V (1kV) |
| Vector Group | YNyn0 | Standard | AS60076 |
| LV BIL | 28kV | HV BIL | 45kV |
| Specification | Data | Specification | Data |
|---|---|---|---|
| Cooling Method | ONAN | Insulating Liquid | Mineral Oil |
| Insulation Class | A (105°C) | Temperature Rise | 60/55K (Winding/Top Oil) |
| Winding Material | Aluminum / Aluminum (HV/LV) | Service Condition | Indoor / Outdoor |
| Ambient Temperature | -5°C to +45°C | Maximum Altitude | ≤1000m |
| Specification | Data | Specification | Data |
|---|---|---|---|
| No-Load Loss | 738.6W | Load Loss at 85°C | 5474.9W |
| Impedance | 3.74% | No-Load Current | 0.60% |
General arrangement drawings, overall dimensions, terminal layout, YNyn0 vector group wiring diagrams, and oil containment bund details for site foundation planning and electrical installation.
![]()
![]()
Standard factory-configured components and mechanical accessories included with the 500kVA oil-immersed substation transformer.
-
Heavy-Duty Q235 Steel Skid Base — Supports the transformer on a 3000mm × 1800mm structural steel frame with 16mm lifting lugs and four 1-inch drain valves for secure positioning and oil drainage.
-
Oil Level Indicator — Lets site operators check insulating oil volume at a glance during routine inspections.
-
Oil Temperature Indicator — Displays real-time top-oil temperature to help monitor thermal load during operation.
-
Vacuum Pressure Gauge (Y100) — Monitors internal tank pressure changes caused by ambient or load temperature swings.
-
Pressure Relief Valve — Automatically vents excess internal pressure to protect the transformer tank.
-
External Off-Circuit Tap Changer — Allows easy output voltage adjustment from outside the tank without opening the cover.
-
Control Box — Houses monitoring and alarm wiring connections in a dedicated weather-protected enclosure.
-
1" Upper Fill Valve & Drain Valve — Simplifies oil filling, sampling, and draining during commissioning or maintenance.
-
Tank Lifting Lugs & Ground Pads — Provides dedicated crane rigging points and dual grounding pads for site earthing.
| Specification | Available Options | Specification | Available Options |
|---|---|---|---|
| Capacity Range | 500kVA–40MVA | Maximum Capacity | Up to 450MVA |
| Typical Ratings | 500kVA; 630kVA; 1000kVA; 1250kVA; 2000kVA; 2500kVA; 5MVA; 7.5MVA; 10MVA; 15MVA; 20MVA; 25MVA; 30MVA; 40MVA | Primary Voltage |
2.4–69kV, up to 230kV |
| Secondary Voltage | 0.4–35kV | Frequency | 50Hz / 60Hz |
| Primary BIL | 60–350kV | Temperature Rise | 55K / 65K |
| Winding Connection | Dyn11 / Yyn0 / Delta / Wye / Grounded Wye / Other | Cooling Method | ONAN / ONAF / ONAN-ONAF |
| Tap Range | ±5% / ±2×2.5% | Tap Changing | DETC / OLTC |
Applicable Standards: ANSI/IEEE C57 Series / CSA / CSA C88 / DOE / NEMA / AS 60076 / IEC 60076
Target industry sectors and installation environments suited for the 415V to 1kV substation power transformer.
-
Surface & Underground Mining Operations
Steps up 415V site power to 1000V for long-distance feeders supplying pumps, conveyors, ventilation fans, and 1kV mining machinery.
-
Heavy Industrial & Manufacturing Plants
Connects standard 415V plant distribution boards to specialized 1000V three-phase industrial loads.
-
Portable & Skid-Mounted Substation Packages
Mounted on a 3000mm × 1800mm steel skid base for relocatable step-up power skids in temporary or expanding industrial sites.
-
Remote Pumping & Water Treatment Stations
Boosts 415V supply to 1000V to minimize voltage drop across extended cable runs to remote pump stations.
![]()
Three-Phase Oil-Immersed Substation Transformers
- 2000kVA Oil Type Substation Power Transformer 11kV/1kV Step Down AS60076 Standards
- 2500kVA Three Phase Oil Immersed Substation Transformer Step Down 11kV to 433V ONAN
- 6500kVA Double-Split Step-Up Substation Power Transformer 480V to 13.8kV IEC 60076
A: Winley provides clear capacity-based lead times after technical approval: 8–10 weeks for transformers below 10MVA, 10–12 weeks for 10–40MVA transformers, and 18–20 weeks for 40–100MVA transformers. For 230kV power transformers, the standard lead time is 20 weeks.We also provide a detailed production schedule and real-time manufacturing photos to help track progress.
A: We offer a flexible MOQ of just 1 unit. Complete inquiries are quoted within 1-3 days with 24/7 support. Leveraging our extensive North American experience in renewable energy, data centers and large industrial projects, we ensure highly cost-effective and reliable solutions.
A: Yes, We accept OEM and ODM. Winley provides services for power transformers up to 450MVA, with HV systems up to 230kV. We can customize electrical parameters, structure, fluid, protection, switches, gauges, tank and paint according to customer drawings, with the capability to integrate components from brands like Qualitrol, Eaton Cooper, and MR.
A: Yes. Winley Substation power transformers are engineered and manufactured in strict accordance with ANSI/IEEE, CSA, NEMA, relevant ASTM standards and IEC 60076.We bring a proven track record across the United States and Canada, supporting critical applications in industrial manufacturing, renewable energy, and power distribution across a range of capacity and voltage requirements.
A: We deliver a complete compliance package: approval drawings, datasheets, nameplate drawings, routine test reports, installation manuals and accessory manuals. We also back your project with lifetime documentation support.
A: Winley ensures quality through strict ISO 9001 process management with dedicated QC oversight. Prior to delivery, every unit undergoes comprehensive routine testing, including Winding Resistance, Turns Ratio, Polarity and Phase Relation, and No-Load Loss and Excitation Current tests. We also fully support Factory Acceptance Testing (FAT) and third-party inspections (SGS).
A: Yes. Winley Electric provides tailored, fully controllable transportation solutions for large-scale transformer projects to ensure compliant customs clearance and zero-damage delivery. We actively assist in verifying critical logistics factors, including shipping dimensions, total weight, offloading conditions, site accessibility, and lifting/rigging requirements.
A: 24 months from the B/L date, extendable up to 5 years upon request. During the warranty period, we provide free replacement parts upon receiving photos of any damaged accessories, include free spare parts based on order volume, and offer ongoing technical support.