logo
Good price  online

products details

Home > Products >
Substation Power Transformer
>
2000kVA Three-Phase Oil-Immersed Substation Transformer 11kV to 1kV with Oil Containment Bund
Detail Information
Place of Origin:
CHINA
Certification:
CE, ISO
Transformer Type:
Three Phase, Oil Immersed
Rated Capacity:
2000kVA
Primary Voltage:
11kV
Secondary Voltage:
1kV
Vector Group:
Dyn11
Frequency:
50Hz
Cooling Class:
ONAN
Winding Material:
Aluminum
Delivery Time:
90 days
Supply Ability:
50 set/month
Product Description

2000kVA Three-Phase Oil-Immersed Substation Transformer 11kV to 1kV with Oil Containment Bund

Product Overview

The Winley S-2000/11/1 is a 2000kVA three-phase oil-immersed substation transformer built to AS60076. Designed for 50Hz grids, it steps down 11kV primary power to a 1000V secondary output, specifically powering heavy industrial machinery and mining equipment.

  • 1000V Heavy-Duty Output: Directly supplies 1kV systems instead of standard 400V distribution.

  • Built-In Oil Containment: Features an integrated base tray to capture oil leaks and meet site environmental rules.

  • Reliable Voltage Adjustment: Equipped with ONAN cooling, a Dyn11 vector group, and a 5-position tap changer (10,450V–11,550V) to manage grid voltage fluctuations.

Product Display

Factory inspection photos, nameplate details, and structural views of the Winley S-2000/11/1 2000kVA AS60076 oil-immersed substation transformer with its integrated oil containment bund.

2000kVA Three-Phase Oil-Immersed Substation Transformer 11kV to 1kV with Oil Containment Bund

2000kVA Three-Phase Oil-Immersed Substation Transformer 11kV to 1kV with Oil Containment Bund

2000kVA Three-Phase Oil-Immersed Substation Transformer 11kV to 1kV with Oil Containment Bund

Main data
Detailed electrical ratings, insulation specifications, and mechanical weights for model S-2000/11/1.
Electrical Ratings
Specification Data Specification Data
Transformer Type Three Phase Substation Power Transformer Model S-2000/11/1
Rated Capacity 2000kVA Frequency 50Hz
Secondary Voltage 1kV Wye-N Primary Voltage 11kV Delta
Vector Group Dyn11 Standard AS60076
LV BIL 45kV HV BIL 95kV
Cooling, Fluid & Outdoor Construction
Specification Data Specification Data
Cooling Method ONAN Insulating Liquid Mineral Oil
Insulation Class A (105°C) Temperature Rise 60/55K (Winding/Top Oil)
Winding Material Aluminum / Aluminum (HV/LV) Service Condition Indoor / Outdoor
Ambient Temperature -5°C to +45°C Maximum Altitude ≤1000m
Factory-Tested Performance
Specification Data Specification Data
No-Load Loss 1782W Load Loss at 75°C 16256W
Impedance 6% No-Load Current 0.18%
Drawing

General arrangement drawings, overall dimensions, terminal layout, and Dyn11 vector group wiring diagrams for site foundation planning and electrical installation.

2000kVA Three-Phase Oil-Immersed Substation Transformer 11kV to 1kV with Oil Containment Bund

Standard Features

Standard factory-configured components and mechanical accessories included with the 2000kVA oil-immersed substation transformer.

  • Integrated Oil Containment Bund (Oil Tray) Captures accidental insulating oil leaks beneath the transformer tank to protect the surrounding ground and support environmental compliance.

  • Pressure Relief Valve Automatically releases excess internal pressure to help protect the transformer tank from damage.

  • Tap Changer Allows easy adjustment of winding taps to regulate the output voltage when incoming grid voltage varies.

  • Nameplate Clearly displays key electrical ratings, wiring diagrams, and identification details on the unit for quick site inspection and maintenance reference.

  • Terminal Box Houses electrical terminals and connection components inside a protective enclosure for organized, safe cable termination.

  • Oil Drain Valve Makes oil sampling and draining easier during routine maintenance or oil testing.

  • Lifting Lugs Built-in heavy-duty lifting points make crane hoisting, loading, and site placement safer and easier.

  • Instrumentation & Monitoring Gauges (Pressure, Oil Level & Thermometer) Features a pressure indicator, oil level sight glass, and oil thermometer for quick, on-site monitoring of internal pressure, oil status, and operating temperature.

  • Cooling Radiators Dissipate heat from the insulating oil to maintain normal operating temperatures under continuous load.

2000kVA Three-Phase Oil-Immersed Substation Transformer 11kV to 1kV with Oil Containment Bund

Specification Selection Guide
Specification Available Options Specification Available Options
Capacity Range 500kVA–40MVA Maximum Capacity Up to 450MVA
Typical Ratings 500kVA; 630kVA; 1000kVA; 1250kVA; 2000kVA; 2500kVA; 5MVA; 7.5MVA; 10MVA; 15MVA; 20MVA; 25MVA; 30MVA; 40MVA Primary Voltage

2.4–69kV, up to 230kV

Secondary Voltage 0.4–35kV Frequency 50Hz / 60Hz
Primary BIL 60–350kV Temperature Rise 55K / 65K
Winding Connection Dyn11 / Yyn0 / Delta / Wye / Grounded Wye / Other Cooling Method ONAN / ONAF / ONAN-ONAF
Tap Range ±5% / ±2×2.5% Tap Changing DETC / OLTC


Applicable Standards: ANSI/IEEE C57 Series / CSA / CSA C88 / DOE / NEMA / AS 60076 / IEC 60076

Applications

Target industry sectors and installation environments suited for the 11kV to 1000V substation power transformer.

  • Mining & Mineral Processing Operations

Supplies 1000V power directly to underground or surface mining conveyors, crushers, and pumping stations in Australian mining sites.

  • Heavy Industrial Manufacturing Plants

Powers large-scale industrial motors, rolling mills, and high-power VFD (Variable Frequency Drive) systems designed for 1kV input.

  • Environmentally Sensitive & Outdoor Substations

Ideal for sites near waterways, soil-protection zones, or industrial yards where an integrated oil containment tray is required to prevent oil ground contamination.

  • Remote Utility & Infrastructure Microgrids

Supports 11kV medium-voltage distribution networks stepping down to 1000V feeders for long-distance industrial power transmission with reduced cable losses.

2000kVA Three-Phase Oil-Immersed Substation Transformer 11kV to 1kV with Oil Containment Bund

More Products:

Three-Phase Oil-Immersed Substation Transformers

2000kVA Oil Type Substation Power Transformer 11kV/1kV Step Down AS60076 Standards     2500kVA Three Phase Oil Immersed Substation Transformer Step Down 11kV to 433V ONAN     5000kVA Three Phase Oil Immersed Substation Power Transformer 33kv/13.8kV ANSI IEEE Standards

FAQ
Q1: What is the lead time?

A: Winley provides clear capacity-based lead times after technical approval: 8–10 weeks for transformers below 10MVA, 10–12 weeks for 10–40MVA transformers, and 18–20 weeks for 40–100MVA transformers. For 230kV power transformers, the standard lead time is 20 weeks.We also provide a detailed production schedule and real-time manufacturing photos to help track progress.

Q2: How soon can I get a quotation, and what is the MOQ?

A: We offer a flexible MOQ of just 1 unit. Complete inquiries are quoted within 1-3 days with 24/7 support. Leveraging our extensive North American experience in renewable energy, data centers and large industrial projects, we ensure highly cost-effective and reliable solutions.

Q3: Is OEM/ODM available?

A: Yes, We accept OEM and ODM. Winley provides services for power transformers up to 450MVA, with HV systems up to 230kV. We can customize electrical parameters, structure, fluid, protection, switches, gauges, tank and paint according to customer drawings, with the capability to integrate components from brands like Qualitrol, Eaton Cooper, and MR.

Q4: Do your power transformers meet North American standards, and do you have North American project experience?

A: Yes. Winley Substation power transformers are engineered and manufactured in strict accordance with ANSI/IEEE, CSA, NEMA, relevant ASTM standards and IEC 60076.We bring a proven track record across the United States and Canada, supporting critical applications in industrial manufacturing, renewable energy, and power distribution across a range of capacity and voltage requirements.

Q5: What documents can you provide for project approval?

A: We deliver a complete compliance package: approval drawings, datasheets, nameplate drawings, routine test reports, installation manuals and accessory manuals. We also back your project with lifetime documentation support.

Q6: How do you ensure product quality?

A: Winley ensures quality through strict ISO 9001 process management with dedicated QC oversight. Prior to delivery, every unit undergoes comprehensive routine testing, including Winding Resistance, Turns Ratio, Polarity and Phase Relation, and No-Load Loss and Excitation Current tests. We also fully support Factory Acceptance Testing (FAT) and third-party inspections (SGS).

Q7: Do you provide logistics and transportation support for large-scale projects? 

A: Yes. Winley Electric provides tailored, fully controllable transportation solutions for large-scale transformer projects to ensure compliant customs clearance and zero-damage delivery. We actively assist in verifying critical logistics factors, including shipping dimensions, total weight, offloading conditions, site accessibility, and lifting/rigging requirements.

Q8: How long is the warranty?

A: 24 months from the B/L date, extendable up to 5 years upon request. During the warranty period, we provide free replacement parts upon receiving photos of any damaged accessories, include free spare parts based on order volume, and offer ongoing technical support.