Send Message
products

Elevator Three Phase Isolation Transformer K-4 Natural Or Air Cooling

Basic Information
Place of Origin: CHINA
Brand Name: WINLEY
Certification: ISO,CE
Model Number: 500VA
Minimum Order Quantity: 1unit
Price: $25~$60000/Unit
Packaging Details: Plywood case
Delivery Time: 10-15days
Payment Terms: T/T
Supply Ability: 1000units/month
Detail Information
Usage: Elevator Coil Number: Three Windings
Standard: ANSI,IEC K-factor: K-4/K-9
Coil Structure: EI Material: Copper/Aluminium
Temperature Rise: Low Temp. Rise Cooling Method: Natural Or Air Cooling
High Light:

ANSI IEC Three Phase Isolation Transformer

,

EI Coil elevator transformer

,

Three windings Three Phase Isolation Transformer


Product Description

Elevator Three Phase Isolation Transformer K-4 Natural Or Air Cooling

 

 

 

Features

1) 200℃ high temperature resistant enameled wire, low wire loss,effectively improve the service life,the design life is as long as 30 years.

2) Select WISCO cold-rolled oriented silicon steel sheet,with low iron loss rate and silicon content of 3.5%~4.8%.

3) The transformer can withstand voltage upto 5000V,and has strong pressure and heat resistance.

 
Specification
Product Name Three phase dry type transformer
Product Model SG/QZB/SBK/Power transformer/ZSG/SBDG/EPS UPS
Winding Material Enameled copper wire or enameled aluminum wire
Capacity 100VA~5000KVA
Input Voltage 415V or customized
Output Voltage 380V or customized
Frequency 50/60Hz
Connection Type DYN11/YYN0
Insulation Level F/H
Enclosures Protection Level IP00 or higher
Pressure-tight Test 2500V/min
Insulation Resistance >100MΩ
Ground Resistance 25A<100milliohm
Induction Withstand Voltage Test 125Hz / 830V / 60s
Cooling Method Natural or air cooling
Temperature Rise ≤115K
Transformation Ratio <3%
Air Carrying Current <3%
Impedance Voltage about 4.5%
Total Losses 4%
Efficiency 80%--99%
Operating Temperature -15℃~40℃ (40℃, 90%R.H., 56days)
Storage Temperature -25℃~100℃(40℃, 90%R.H., 56days)
Certificate CE,ISO

The technical parameter for reference only, for exactly technical information, please feel free to contact us!

Production process

Elevator Three Phase Isolation Transformer K-4 Natural Or Air Cooling 0

 

Elevator Three Phase Isolation Transformer K-4 Natural Or Air Cooling 1Elevator Three Phase Isolation Transformer K-4 Natural Or Air Cooling 2

 

FAQ

1. Q: Can I have a sample order?

A: Yes, we welcome sample order to test and check quality.

2. Q: What is the lead time?

A: Sample time 3-7 days, we usually ship by DHL, UPS, FedEx,etc. Mass production time 7-25 days.

3. Q: How long is the warranty?

A: 24 monthes from B/L. If there are any accessory problems,just provide the photos of damaged accessory,then we will provide free service. According to the number of products,we will provide easily damaged accessories for free. we also can provide technical support if you need.

4. Q: Is OEM/ODM available?

A: Yes,it is! We are manufacturer with our own R&D team, we can customize products according to customer's drawing or requirements.

Customized services:

a. Customized color and special function.

b. Customized box.

c. Print customer's logo(MOQ:≥10pcs).

d. Your other ideas about product, we can help you design and put them into production. The above customized services must be confirmed before production.

5. Q: How to control the products quality?

A: Our company owns the core technology ,all kinds of products hold CE certificate. We have professional engineers. Workers are strictly required to make products according to the drawings. Each process has technical instructors.The QC supervisors will regularly inspect the production. We will do products performance tests during production, and comprehensive quality tests when the products is completed.

Contact Details
Steven

Phone Number : 86-18650108051

WhatsApp : +8618650108051